Show Data 30 days

DateTime DamName WaterLevel-m.msl. TailWater-m.msl. Inflow-MCM/day Released-MCM/day Storage-MCM Spillway-MCM/day Losses-MCM/day Evap-MCM/day
26/07/2019BHUMIBOL DAM218.3900137.5500.910020.58004482.1000.0000.0000.0100
27/07/2019BHUMIBOL DAM218.2300137.6000.180021.13004460.8100.0000.0000.0100
28/07/2019BHUMIBOL DAM218.0700137.9000.180021.07004439.5800.0000.0000.0100
29/07/2019BHUMIBOL DAM217.9200137.90001.500021.00004419.7400.0000.0000.0100
30/07/2019BHUMIBOL DAM217.7900137.85004.060020.87004402.5900.0000.0000.0100
31/07/2019BHUMIBOL DAM217.6400137.89001.660021.06004382.8600.0000.0000.0100
01/08/2019BHUMIBOL DAM217.4300137.9100.000021.07004355.3200.0000.0000.0100
02/08/2019BHUMIBOL DAM217.1900138.1500.000021.24004324.0000.0000.0000.0100
03/08/2019BHUMIBOL DAM217.0400138.26001.880021.06004304.4900.0000.0000.0100
04/08/2019BHUMIBOL DAM216.9000138.32003.390021.22004286.3400.0000.0000.0100
05/08/2019BHUMIBOL DAM216.9000138.370016.380016.05004286.3400.0000.0000.0100
06/08/2019BHUMIBOL DAM217.1100138.020043.030015.45004313.5900.0000.0000.0100
07/08/2019BHUMIBOL DAM217.3100138.050039.670013.28004339.6400.0000.0000.0100
08/08/2019BHUMIBOL DAM217.4400138.290030.420013.10004356.6300.0000.0000.0100
09/08/2019BHUMIBOL DAM217.6200138.280036.910012.98004380.2300.0000.0000.0100
10/08/2019BHUMIBOL DAM217.7200138.260026.430012.96004393.3700.0000.0000.0100
11/08/2019BHUMIBOL DAM217.8400138.240029.130012.99004409.1800.0000.0000.0100
12/08/2019BHUMIBOL DAM218.0800138.280042.080010.03004440.9000.0000.0000.0100
13/08/2019BHUMIBOL DAM218.2700138.100035.570010.02004466.1200.0000.0000.0100
14/08/2019BHUMIBOL DAM218.3900138.000026.28009.98004482.1000.0000.0000.0100
15/08/2019BHUMIBOL DAM218.3500138.00005.070010.06004476.7700.0000.0000.0100
16/08/2019BHUMIBOL DAM218.4800138.200027.780010.11004494.1000.0000.0000.0100
17/08/2019BHUMIBOL DAM218.5400138.200018.23009.87004502.1200.0000.0000.0100
18/08/2019BHUMIBOL DAM218.6000138.200018.380010.01004510.1400.0000.0000.0100
19/08/2019BHUMIBOL DAM218.7500138.230027.47007.03004530.2400.0000.0000.0100
20/08/2019BHUMIBOL DAM218.9200138.220030.14006.95004553.1000.0000.0000.0100
21/08/2019BHUMIBOL DAM219.0400138.210023.42006.90004569.2700.0000.0000.0100
22/08/2019BHUMIBOL DAM219.1000138.200015.42006.98004577.3700.0000.0000.0100
23/08/2019BHUMIBOL DAM219.2200137.950023.51006.94004593.6000.0000.0000.0100
24/08/2019BHUMIBOL DAM219.3900137.600030.35006.95004616.6600.0000.0000.0100
26/07/2019BANGLANG DAM101.700043.45003.39004.0700827.8600.0000.0000.1200
27/07/2019BANGLANG DAM101.670043.30002.95004.0200826.6800.0000.0000.1100
28/07/2019BANGLANG DAM101.640043.30003.03004.1000825.5000.0000.0000.1100
29/07/2019BANGLANG DAM101.580043.26001.70003.9500823.1400.0000.0000.1100
30/07/2019BANGLANG DAM101.520043.20001.83004.0700820.7800.0000.0000.1100
31/07/2019BANGLANG DAM101.450043.20001.47004.1000818.0400.0000.0000.1100
01/08/2019BANGLANG DAM101.400043.06002.11003.9500816.0800.0000.0000.1200
02/08/2019BANGLANG DAM101.320043.1700.95003.9500812.9600.0000.0000.1200
03/08/2019BANGLANG DAM101.270043.26002.21004.0400811.0100.0000.0000.1200
04/08/2019BANGLANG DAM101.190043.26001.00003.9900807.9000.0000.0000.1200
05/08/2019BANGLANG DAM101.120043.44001.37003.9700805.1900.0000.0000.1200
06/08/2019BANGLANG DAM101.040043.20001.04004.0200802.0900.0000.0000.1200
07/08/2019BANGLANG DAM100.960043.19001.05004.0300799.0000.0000.0000.1200
08/08/2019BANGLANG DAM100.890043.45001.36003.9400796.3000.0000.0000.1200
09/08/2019BANGLANG DAM100.810043.30001.11004.0800793.2300.0000.0000.1200
10/08/2019BANGLANG DAM100.750043.18001.80003.9800790.9300.0000.0000.1200
11/08/2019BANGLANG DAM100.690043.16001.81003.9900788.6300.0000.0000.1100
12/08/2019BANGLANG DAM100.620043.06001.55004.1100785.9500.0000.0000.1100
13/08/2019BANGLANG DAM100.540043.34001.06004.0000782.9000.0000.0000.1100
14/08/2019BANGLANG DAM100.560043.34004.89004.0100783.6600.0000.0000.1100
15/08/2019BANGLANG DAM100.540043.22002.52003.1700782.9000.0000.0000.1100
16/08/2019BANGLANG DAM100.510043.26001.98003.0000781.7600.0000.0000.1100
17/08/2019BANGLANG DAM100.540043.30004.40003.1500782.9000.0000.0000.1100
18/08/2019BANGLANG DAM100.620043.86006.09002.9200785.9500.0000.0000.1100
19/08/2019BANGLANG DAM100.620043.20003.15003.0400785.9500.0000.0000.1100
20/08/2019BANGLANG DAM100.590043.06001.95002.9800784.8100.0000.0000.1100
21/08/2019BANGLANG DAM100.580043.14002.84003.1100784.4300.0000.0000.1100
22/08/2019BANGLANG DAM100.540043.16001.59003.0000782.9000.0000.0000.1100
23/08/2019BANGLANG DAM100.510043.10002.05003.0800781.7600.0000.0000.1100
24/08/2019BANGLANG DAM100.530043.06003.93003.0600782.5200.0000.0000.1100
26/07/2019CHULABHORN DAM740.7800370.5000.0400.000042.7300.0000.0000.0100
27/07/2019CHULABHORN DAM740.8200370.5000.1400.000042.8600.0000.0000.0100
28/07/2019CHULABHORN DAM740.8500370.5000.1100.000042.9600.0000.0000.0100
29/07/2019CHULABHORN DAM740.8100370.5000.0800.200042.8300.0000.0000.0100
30/07/2019CHULABHORN DAM740.7700370.5000.0800.200042.7000.0000.0000.0100
31/07/2019CHULABHORN DAM740.7000370.5000.0000.200042.4700.0000.0200.0100
01/08/2019CHULABHORN DAM740.6600370.5000.0800.200042.3400.0000.0000.0100
02/08/2019CHULABHORN DAM740.6000370.5000.0200.210042.1400.0000.0000.0100
03/08/2019CHULABHORN DAM740.5200370.5000.0000.200041.8800.0000.0500.0100
04/08/2019CHULABHORN DAM740.5700370.5000.1700.000042.0400.0000.0000.0100
05/08/2019CHULABHORN DAM740.5600370.5000.0000.000042.0100.0000.0200.0100
06/08/2019CHULABHORN DAM740.6000370.5000.1400.000042.1400.0000.0000.0100
07/08/2019CHULABHORN DAM740.6200370.5000.0700.000042.2100.0000.0000.0100
08/08/2019CHULABHORN DAM740.4700370.5000.0000.460041.7200.0000.0200.0100
09/08/2019CHULABHORN DAM740.3000370.5000.0000.540041.1700.0000.0000.0100
10/08/2019CHULABHORN DAM740.3200370.5000.0700.000041.2400.0000.0000.0100
11/08/2019CHULABHORN DAM740.3200370.5000.0100.000041.2400.0000.0000.0100
12/08/2019CHULABHORN DAM740.3400370.5000.0700.000041.3000.0000.0000.0100
13/08/2019CHULABHORN DAM740.3800370.5000.1400.000041.4300.0000.0000.0100
14/08/2019CHULABHORN DAM740.3900370.5000.0400.000041.4600.0000.0000.0100
15/08/2019CHULABHORN DAM740.3800370.5000.6000.620041.4300.0000.0000.0100
16/08/2019CHULABHORN DAM740.0900370.5000.0000.390040.5100.0000.5200.0100
17/08/2019CHULABHORN DAM740.1200370.5000.1000.000040.6000.0000.0000.0100
18/08/2019CHULABHORN DAM740.1400370.5000.0700.000040.6700.0000.0000.0100
19/08/2019CHULABHORN DAM740.1400370.5000.0100.000040.6700.0000.0000.0100
20/08/2019CHULABHORN DAM740.1700370.5000.1300.020040.7600.0000.0000.0100
21/08/2019CHULABHORN DAM740.1900370.5000.0700.000040.8300.0000.0000.0100
22/08/2019CHULABHORN DAM740.2200370.5000.1000.000040.9200.0000.0000.0100
23/08/2019CHULABHORN DAM740.2400370.5000.1000.030040.9800.0000.0000.0100
24/08/2019CHULABHORN DAM740.3000370.5000.2000.000041.1700.0000.0000.0100
26/07/2019HUAI KUM DAM304.5000281.5100.0000.00006.5800.0000.0200.0000
27/07/2019HUAI KUM DAM304.5000281.5100.0000.00006.5800.0000.0000.0000
28/07/2019HUAI KUM DAM304.4200282.1000.1000.20006.4900.0000.0000.0000
29/07/2019HUAI KUM DAM303.9500282.1000.0000.44005.9100.0000.1300.0000
30/07/2019HUAI KUM DAM303.4900282.1000.0000.39005.4100.0000.1000.0000
31/07/2019HUAI KUM DAM303.4800282.1000.0000.00005.4000.0000.0100.0000
01/08/2019HUAI KUM DAM303.4800281.5300.0000.00005.4000.0000.0000.0000
02/08/2019HUAI KUM DAM303.4900281.5300.0100.00005.4100.0000.0000.0000
03/08/2019HUAI KUM DAM303.4900281.5300.0000.00005.4100.0000.0000.0000
04/08/2019HUAI KUM DAM303.4800281.5100.0000.00005.4000.0000.0100.0000
05/08/2019HUAI KUM DAM303.4800281.5100.0000.00005.4000.0000.0000.0000
06/08/2019HUAI KUM DAM303.4800281.5100.0000.00005.4000.0000.0000.0000
07/08/2019HUAI KUM DAM303.4800281.5100.0000.00005.4000.0000.0000.0000
08/08/2019HUAI KUM DAM303.4800281.5100.0000.00005.4000.0000.0000.0000
09/08/2019HUAI KUM DAM303.4700281.5100.0000.00005.3900.0000.0100.0000
10/08/2019HUAI KUM DAM303.4700281.5200.0000.00005.3900.0000.0000.0000
11/08/2019HUAI KUM DAM303.4600281.5200.0000.00005.3800.0000.0100.0000
12/08/2019HUAI KUM DAM303.4600281.5100.0000.00005.3800.0000.0000.0000
13/08/2019HUAI KUM DAM303.4600281.5100.0000.00005.3800.0000.0000.0000
14/08/2019HUAI KUM DAM303.4600281.5100.0000.00005.3800.0000.0000.0000
15/08/2019HUAI KUM DAM303.4500281.5100.0000.00005.3700.0000.0100.0000
16/08/2019HUAI KUM DAM303.4500281.5100.0000.00005.3700.0000.0000.0000
17/08/2019HUAI KUM DAM303.4700281.5100.0200.00005.3900.0000.0000.0000
18/08/2019HUAI KUM DAM303.4500281.5100.0000.00005.3700.0000.0200.0000
19/08/2019HUAI KUM DAM303.4500281.5100.0000.00005.3700.0000.0000.0000
20/08/2019HUAI KUM DAM303.4300281.5100.1100.13005.3500.0000.0000.0000
21/08/2019HUAI KUM DAM303.4400281.5100.0100.00005.3600.0000.0000.0000
22/08/2019HUAI KUM DAM303.4200281.5100.0000.00005.3400.0000.0200.0000
23/08/2019HUAI KUM DAM303.4200281.5100.0000.00005.3400.0000.0000.0000
24/08/2019HUAI KUM DAM303.4200281.5100.0000.00005.3400.0000.0000.0000
26/07/2019KANG KRACHAN DAM90.640049.60001.74001.2900367.9200.0000.0000.1000
27/07/2019KANG KRACHAN DAM90.630049.60001.10001.3000367.6200.0000.0000.1000
28/07/2019KANG KRACHAN DAM90.620049.60001.10001.3000367.3300.0000.0000.1000
29/07/2019KANG KRACHAN DAM90.600049.6000.8000.2200366.7400.0000.0000.1000
30/07/2019KANG KRACHAN DAM90.580049.6000.79001.2800366.1600.0000.0000.1000
31/07/2019KANG KRACHAN DAM90.550050.70001.84002.6200365.2800.0000.0000.1000
01/08/2019KANG KRACHAN DAM90.520050.70001.84002.6200364.4100.0000.0000.0900
02/08/2019KANG KRACHAN DAM90.530050.70002.96002.6200364.7000.0000.0000.0900
03/08/2019KANG KRACHAN DAM90.580049.60003.76002.1200366.1600.0000.0000.0900
04/08/2019KANG KRACHAN DAM90.770049.60007.90002.0900371.7800.0000.0000.0900
05/08/2019KANG KRACHAN DAM90.990049.60008.97002.0800378.4900.0000.0000.0900
06/08/2019KANG KRACHAN DAM91.380049.600014.34001.7800390.8800.0000.0000.0900
07/08/2019KANG KRACHAN DAM92.200049.600029.83001.7500418.8500.0000.0000.1000
08/08/2019KANG KRACHAN DAM92.700049.600020.46002.1300437.0800.0000.0000.1000
09/08/2019KANG KRACHAN DAM92.800050.70006.39002.5500440.8200.0000.0000.1000
10/08/2019KANG KRACHAN DAM93.150050.700015.97002.5300454.1600.0000.0000.1000
11/08/2019KANG KRACHAN DAM93.400050.700013.20003.3500463.9100.0000.0000.1000
12/08/2019KANG KRACHAN DAM93.690050.700014.95003.3200475.4400.0000.0000.1100
13/08/2019KANG KRACHAN DAM93.950050.800014.96003.7600485.9600.0000.0000.1100
14/08/2019KANG KRACHAN DAM94.090051.000011.05003.7700491.6900.0000.0000.1100
15/08/2019KANG KRACHAN DAM94.140051.00007.37003.7600493.7500.0000.0000.1100
16/08/2019KANG KRACHAN DAM94.160051.20007.03003.5800494.5700.0000.0000.1100
17/08/2019KANG KRACHAN DAM94.160051.20006.29003.6500494.5700.0000.0000.1100
18/08/2019KANG KRACHAN DAM94.180051.00006.07003.7500495.4000.0000.0000.1100
19/08/2019KANG KRACHAN DAM94.210051.00006.48003.7500496.6400.0000.0000.1100
20/08/2019KANG KRACHAN DAM94.210051.00005.24003.7500496.6400.0000.0000.1100
21/08/2019KANG KRACHAN DAM94.220050.80004.80003.8400497.0600.0000.0000.1100
22/08/2019KANG KRACHAN DAM94.240050.80005.21003.8400497.8800.0000.0000.1100
23/08/2019KANG KRACHAN DAM94.280050.80006.04003.8400499.5400.0000.0000.1100
24/08/2019KANG KRACHAN DAM94.310050.80005.62003.8400500.7900.0000.0000.1100
26/07/2019MAE NGAT DAM377.9200342.0000.6000.080075.9600.0000.0000.0000
27/07/2019MAE NGAT DAM377.9400342.0000.1200.000076.0800.0000.0000.0000
28/07/2019MAE NGAT DAM378.0700342.0000.7500.000076.8200.0000.0000.0000
29/07/2019MAE NGAT DAM378.1600342.0000.5200.000077.3400.0000.0000.0000
30/07/2019MAE NGAT DAM378.1900342.0000.1700.000077.5100.0000.0000.0000
31/07/2019MAE NGAT DAM378.2100342.0000.1200.000077.6300.0000.0000.0000
01/08/2019MAE NGAT DAM378.2300342.0000.1200.000077.7400.0000.0000.0000
02/08/2019MAE NGAT DAM378.4200342.00001.0900.000078.8300.0000.0000.0000
03/08/2019MAE NGAT DAM378.5700342.0000.8600.000079.7000.0000.0000.0000
04/08/2019MAE NGAT DAM378.6300342.0000.3500.000080.0400.0000.0000.0000
05/08/2019MAE NGAT DAM378.8400342.00001.2100.000081.2500.0000.0000.0000
06/08/2019MAE NGAT DAM379.3700342.00003.0500.000084.2900.0000.0000.0000
07/08/2019MAE NGAT DAM379.7200342.00002.0100.000086.3000.0000.0000.0000
08/08/2019MAE NGAT DAM379.8400342.0000.6900.000086.9900.0000.0000.0000
09/08/2019MAE NGAT DAM379.8900342.0000.2900.000087.2800.0000.0000.0000
10/08/2019MAE NGAT DAM379.9600342.0000.4000.000087.6800.0000.0000.0000
11/08/2019MAE NGAT DAM380.1600342.00001.4600.000089.1400.0000.0000.0000
12/08/2019MAE NGAT DAM380.2600342.0000.7700.000089.9000.0000.0000.0000
13/08/2019MAE NGAT DAM380.3300342.0000.5400.000090.4400.0000.0000.0000
14/08/2019MAE NGAT DAM380.4500342.0000.9200.000091.3600.0000.0000.0000
15/08/2019MAE NGAT DAM380.5100342.0000.4600.000091.8200.0000.0000.0000
16/08/2019MAE NGAT DAM380.6300342.0000.9200.000092.7400.0000.0000.0000
17/08/2019MAE NGAT DAM381.0100342.00002.9200.000095.6600.0000.0000.0000
18/08/2019MAE NGAT DAM381.3200342.00002.3800.000098.0400.0000.0000.0000
19/08/2019MAE NGAT DAM381.5100342.00001.4600.000099.4900.0000.0000.0000
20/08/2019MAE NGAT DAM381.5900342.0000.6200.0000100.1100.0000.0000.0000
21/08/2019MAE NGAT DAM381.7000342.0000.8500.0000100.9500.0000.0000.0000
22/08/2019MAE NGAT DAM381.8900342.00001.4600.0000102.4100.0000.0000.0000
23/08/2019MAE NGAT DAM382.2200342.00002.4600.0000104.9400.0000.0000.0000
24/08/2019MAE NGAT DAM382.6300342.00003.1500.0000108.0900.0000.0000.0000
26/07/2019NAM PUNG DAM274.6400195.1000.2000.000032.4100.0000.0000.0200
27/07/2019NAM PUNG DAM274.6400195.1000.0500.000032.4100.0000.0000.0200
28/07/2019NAM PUNG DAM274.6500195.1000.1200.000032.4900.0000.0000.0200
29/07/2019NAM PUNG DAM274.6600195.1000.1200.000032.5600.0000.0000.0200
30/07/2019NAM PUNG DAM274.6600195.1000.0500.000032.5600.0000.0000.0200
31/07/2019NAM PUNG DAM274.7200195.1000.5000.000033.0100.0000.0000.0200
01/08/2019NAM PUNG DAM274.7400195.1000.2000.000033.1700.0000.0000.0200
02/08/2019NAM PUNG DAM274.8000195.1000.5000.000033.6300.0000.0000.0200
03/08/2019NAM PUNG DAM274.8000195.1000.0000.000033.6300.0000.0300.0200
04/08/2019NAM PUNG DAM274.8300195.1000.2800.000033.8600.0000.0000.0200
05/08/2019NAM PUNG DAM274.8500195.1000.2000.000034.0100.0000.0000.0200
06/08/2019NAM PUNG DAM274.8500195.1000.0500.000034.0100.0000.0000.0200
07/08/2019NAM PUNG DAM274.8500195.1000.0500.000034.0100.0000.0000.0200
08/08/2019NAM PUNG DAM274.8600195.1000.1200.000034.0900.0000.0000.0200
09/08/2019NAM PUNG DAM274.8600195.1000.0500.000034.0900.0000.0000.0200
10/08/2019NAM PUNG DAM274.9200195.1000.5200.000034.5600.0000.0000.0200
11/08/2019NAM PUNG DAM274.9800195.1000.5200.000035.0300.0000.0000.0200
12/08/2019NAM PUNG DAM274.9800195.1000.0500.000035.0300.0000.0000.0200
13/08/2019NAM PUNG DAM275.0000195.1000.2100.000035.1900.0000.0000.0200
14/08/2019NAM PUNG DAM275.0200195.1000.2100.000035.3500.0000.0000.0200
15/08/2019NAM PUNG DAM275.0400195.1000.2100.000035.5100.0000.0000.0200
16/08/2019NAM PUNG DAM275.0600195.1000.2100.000035.6700.0000.0000.0200
17/08/2019NAM PUNG DAM275.1400195.1000.7000.000036.3200.0000.0000.0200
18/08/2019NAM PUNG DAM275.2500195.1000.9600.000037.2300.0000.0000.0200
19/08/2019NAM PUNG DAM275.3500195.1000.8900.000038.0800.0000.0000.0200
20/08/2019NAM PUNG DAM275.3800195.1000.3000.000038.3300.0000.0000.0200
21/08/2019NAM PUNG DAM275.4200195.1000.3900.000038.6800.0000.0000.0200
22/08/2019NAM PUNG DAM275.5000195.1000.7400.000039.3700.0000.0000.0200
23/08/2019NAM PUNG DAM276.1500195.10006.0800.000045.4000.0000.0000.0200
24/08/2019NAM PUNG DAM276.6000195.10004.5700.000049.9200.0000.0000.0200
26/07/2019PAK MUN DAM107.170094.7500.000020.3900.0000.0000.0000.0000
27/07/2019PAK MUN DAM106.950094.7400.000029.4600.0000.0000.0000.0000
28/07/2019PAK MUN DAM106.860094.3200.000021.6400.0000.0000.0000.0000
29/07/2019PAK MUN DAM106.780094.3200.000016.6500.0000.0000.0000.0000
30/07/2019PAK MUN DAM106.900094.3200.000017.0400.0000.0000.0000.0000
31/07/2019PAK MUN DAM106.810094.3200.000037.4700.0000.0000.0000.0000
01/08/2019PAK MUN DAM106.620094.8600.000051.2700.0000.0000.0000.0000
02/08/2019PAK MUN DAM106.760095.6800.000037.4900.00002.8800.0000.0000
03/08/2019PAK MUN DAM106.690095.7000.000044.7700.0000.0000.0000.0000
04/08/2019PAK MUN DAM106.580095.2000.000038.4000.0000.0000.0000.0000
05/08/2019PAK MUN DAM106.610095.5000.000033.4800.0000.0000.0000.0000
06/08/2019PAK MUN DAM106.650095.4800.000028.7900.0000.0000.0000.0000
07/08/2019PAK MUN DAM106.730095.4800.000022.9500.0000.0000.0000.0000
08/08/2019PAK MUN DAM106.740094.6500.000014.7300.0000.0000.0000.0000
09/08/2019PAK MUN DAM107.010094.6300.0000.4400.0000.0000.0000.0000
10/08/2019PAK MUN DAM106.970094.8800.000027.5400.0000.0000.0000.0000
11/08/2019PAK MUN DAM106.840094.8800.000041.4000.0000.0000.0000.0000
12/08/2019PAK MUN DAM106.800094.8800.000035.1800.0000.0000.0000.0000
13/08/2019PAK MUN DAM106.800094.8800.000020.9100.00003.2200.0000.0000
14/08/2019PAK MUN DAM106.820095.4600.000024.2700.0000.0000.0000.0000
15/08/2019PAK MUN DAM106.800095.2400.000021.2900.0000.0000.0000.0000
16/08/2019PAK MUN DAM106.850095.5500.000015.9900.0000.0000.0000.0000
17/08/2019PAK MUN DAM106.870095.7000.000018.4600.0000.0000.0000.0000
18/08/2019PAK MUN DAM106.700096.6500.000023.0500.0000.0000.0000.0000
19/08/2019PAK MUN DAM106.830096.6500.000013.6300.0000.0000.0000.0000
20/08/2019PAK MUN DAM106.850096.6500.000033.9100.0000.0000.0000.0000
21/08/2019PAK MUN DAM106.720096.9500.000040.6600.0000.0000.0000.0000
22/08/2019PAK MUN DAM106.700097.5000.000037.3500.0000.0000.0000.0000
23/08/2019PAK MUN DAM106.810097.5000.000039.3800.0000.0000.0000.0000
24/08/2019PAK MUN DAM106.820098.7000.000067.5900.0000.0000.0000.0000
26/07/2019RAJJAPRABHA DAM80.980014.45005.13007.44003428.4400.0000.0000.3600
27/07/2019RAJJAPRABHA DAM80.970010.80004.82005.80003427.1100.0000.0000.3600
28/07/2019RAJJAPRABHA DAM80.950010.80002.67004.98003424.4400.0000.0000.3600
29/07/2019RAJJAPRABHA DAM80.930014.30002.64004.94003421.7700.0000.0000.3600
30/07/2019RAJJAPRABHA DAM80.910012.59002.53004.84003419.1000.0000.0000.3600
31/07/2019RAJJAPRABHA DAM80.890013.20002.91005.22003416.4300.0000.0000.3600
01/08/2019RAJJAPRABHA DAM80.860012.40006.370010.02003412.4300.0000.0000.3500
02/08/2019RAJJAPRABHA DAM80.830014.60006.20009.84003408.4400.0000.0000.3500
03/08/2019RAJJAPRABHA DAM80.830014.51009.94009.59003408.4400.0000.0000.3500
04/08/2019RAJJAPRABHA DAM80.830010.80003.57003.22003408.4400.0000.0000.3500
05/08/2019RAJJAPRABHA DAM80.910010.800016.07005.06003419.1000.0000.0000.3500
06/08/2019RAJJAPRABHA DAM80.950010.800011.25005.57003424.4400.0000.0000.3500
07/08/2019RAJJAPRABHA DAM80.950013.47005.06004.70003424.4400.0000.0000.3500
08/08/2019RAJJAPRABHA DAM80.950010.97005.65005.30003424.4400.0000.0000.3500
09/08/2019RAJJAPRABHA DAM81.030014.430015.53004.49003435.1200.0000.0000.3500
10/08/2019RAJJAPRABHA DAM81.180013.670025.41004.96003455.2100.0000.0000.3600
11/08/2019RAJJAPRABHA DAM81.450012.310039.61002.92003491.5500.0000.0000.3600
12/08/2019RAJJAPRABHA DAM81.570012.010022.44005.86003507.7700.0000.0000.3600
13/08/2019RAJJAPRABHA DAM81.650013.060016.21005.02003518.6000.0000.0000.3600
14/08/2019RAJJAPRABHA DAM81.700013.030012.22005.08003525.3900.0000.0000.3600
15/08/2019RAJJAPRABHA DAM81.810012.100020.72005.41003540.3400.0000.0000.3600
16/08/2019RAJJAPRABHA DAM81.870013.230020.500011.97003548.5100.0000.0000.3600
17/08/2019RAJJAPRABHA DAM82.000014.250023.00004.90003566.2500.0000.0000.3600
18/08/2019RAJJAPRABHA DAM82.040010.80009.65003.82003571.7200.0000.0000.3600
19/08/2019RAJJAPRABHA DAM82.100013.430017.87009.29003579.9300.0000.0000.3600
20/08/2019RAJJAPRABHA DAM82.110011.65004.93003.20003581.3000.0000.0000.3600
21/08/2019RAJJAPRABHA DAM82.150012.30008.94003.10003586.7800.0000.0000.3600
22/08/2019RAJJAPRABHA DAM82.230010.800014.16002.82003597.7600.0000.0000.3600
23/08/2019RAJJAPRABHA DAM82.250013.20007.83004.72003600.5100.0000.0000.3700
24/08/2019RAJJAPRABHA DAM82.290012.17009.85003.99003606.0100.0000.0000.3700
26/07/2019SIRIKIT DAM131.080074.59003.440019.00003240.5700.0000.0000.5100
27/07/2019SIRIKIT DAM130.980074.00006.180019.00003227.2500.0000.0000.5100
28/07/2019SIRIKIT DAM130.920075.520011.420018.88003219.2800.0000.0000.5100
29/07/2019SIRIKIT DAM130.870075.38007.880013.99003212.6600.0000.0000.5000
30/07/2019SIRIKIT DAM130.820075.27007.770013.87003206.0600.0000.0000.5000
31/07/2019SIRIKIT DAM130.830075.410015.840014.02003207.3800.0000.0000.5000
01/08/2019SIRIKIT DAM131.250072.600070.480014.05003263.3500.0000.0000.4600
02/08/2019SIRIKIT DAM131.540072.600053.870014.13003302.6200.0000.0000.4600
03/08/2019SIRIKIT DAM131.590075.240025.260017.98003309.4500.0000.0000.4600
04/08/2019SIRIKIT DAM131.610075.560020.990017.80003312.1800.0000.0000.4600
05/08/2019SIRIKIT DAM131.750075.470033.570013.91003331.3800.0000.0000.4600
06/08/2019SIRIKIT DAM132.250074.100083.990014.00003400.9000.0000.0000.4700
07/08/2019SIRIKIT DAM132.520075.390052.540013.92003439.0500.0000.0000.4700
08/08/2019SIRIKIT DAM132.690072.600034.770010.06003463.2900.0000.0000.4700
09/08/2019SIRIKIT DAM132.780075.150023.15009.77003476.1900.0000.0000.4700
10/08/2019SIRIKIT DAM132.910075.480029.04009.85003494.9100.0000.0000.4700
11/08/2019SIRIKIT DAM133.160075.520046.37009.63003531.1700.0000.0000.4800
12/08/2019SIRIKIT DAM133.390072.600042.21008.06003564.8400.0000.0000.4800
13/08/2019SIRIKIT DAM133.560072.600033.48007.91003589.9200.0000.0000.4800
14/08/2019SIRIKIT DAM133.750072.600036.66007.96003618.1400.0000.0000.4800
15/08/2019SIRIKIT DAM133.870072.600026.45008.03003636.0700.0000.0000.4800
16/08/2019SIRIKIT DAM134.050072.600035.55008.02003663.1100.0000.0000.4900
17/08/2019SIRIKIT DAM134.260074.570040.06007.80003694.8800.0000.0000.4900
18/08/2019SIRIKIT DAM134.880072.6000103.60007.92003790.0700.0000.0000.4900
19/08/2019SIRIKIT DAM135.440072.600092.21003.98003877.8000.0000.0000.5000
20/08/2019SIRIKIT DAM135.820072.600064.93003.96003938.2600.0000.0000.5000
21/08/2019SIRIKIT DAM136.190074.630064.00003.92003997.8400.0000.0000.5100
22/08/2019SIRIKIT DAM136.800072.6000104.26004.02004097.5700.0000.0000.5200
23/08/2019SIRIKIT DAM137.180073.530067.42003.84004160.6300.0000.0000.5200
24/08/2019SIRIKIT DAM137.550072.600066.63004.03004222.7100.0000.0000.5200
26/07/2019SRINAGARIND DAM169.000059.49005.840019.090013500.0800.0000.0000.8600
27/07/2019SRINAGARIND DAM168.990059.340011.350014.010013496.5500.0000.0000.8600
28/07/2019SRINAGARIND DAM168.970058.34008.470014.660013489.5000.0000.0000.8600
29/07/2019SRINAGARIND DAM168.940059.00006.640016.360013478.9200.0000.0000.8600
30/07/2019SRINAGARIND DAM168.930058.560011.800014.460013475.4000.0000.0000.8600
31/07/2019SRINAGARIND DAM168.910058.46006.610012.790013468.3500.0000.0000.8600
01/08/2019SRINAGARIND DAM168.870058.990012.640025.870013454.2700.0000.0000.8500
02/08/2019SRINAGARIND DAM168.920059.120036.630018.170013471.8800.0000.0000.8500
03/08/2019SRINAGARIND DAM169.000058.860051.100022.040013500.0800.0000.0000.8500
04/08/2019SRINAGARIND DAM169.060059.460042.630020.600013521.2500.0000.0000.8500
05/08/2019SRINAGARIND DAM169.130058.460044.760019.170013545.9900.0000.0000.8600
06/08/2019SRINAGARIND DAM169.240058.800061.850022.070013584.9100.0000.0000.8600
07/08/2019SRINAGARIND DAM169.370058.600062.830015.880013631.0000.0000.0000.8600
08/08/2019SRINAGARIND DAM169.460058.700049.010016.180013662.9700.0000.0000.8600
09/08/2019SRINAGARIND DAM169.590058.980065.470018.350013709.2400.0000.0000.8600
10/08/2019SRINAGARIND DAM169.730058.920060.23009.430013759.1700.0000.0000.8600
11/08/2019SRINAGARIND DAM169.850059.300057.930014.170013802.0700.0000.0000.8700
12/08/2019SRINAGARIND DAM169.960058.420059.830019.570013841.4600.0000.0000.8700
13/08/2019SRINAGARIND DAM170.070058.120051.480011.140013880.9300.0000.0000.8700
14/08/2019SRINAGARIND DAM170.160057.840047.050013.840013913.2700.0000.0000.8700
15/08/2019SRINAGARIND DAM170.230058.300041.290015.230013938.4600.0000.0000.8700
16/08/2019SRINAGARIND DAM170.300058.720037.550011.460013963.6800.0000.0000.8700
17/08/2019SRINAGARIND DAM170.340058.480029.450014.150013978.1100.0000.0000.8700
18/08/2019SRINAGARIND DAM170.390058.280031.270013.240013996.1500.0000.0000.8700
19/08/2019SRINAGARIND DAM170.420058.450027.220015.510014006.9900.0000.0000.8700
20/08/2019SRINAGARIND DAM170.480058.180033.370010.810014028.6700.0000.0000.8700
21/08/2019SRINAGARIND DAM170.530057.920031.550012.580014046.7500.0000.0000.8800
22/08/2019SRINAGARIND DAM170.600057.920037.410011.190014072.1000.0000.0000.8800
23/08/2019SRINAGARIND DAM170.650058.180035.740016.740014090.2200.0000.0000.8800
24/08/2019SRINAGARIND DAM170.700059.760037.430018.410014108.3600.0000.0000.8800
26/07/2019SIRINDHORN DAM137.7000107.80004.5400.3500917.7000.0000.0000.6200
27/07/2019SIRINDHORN DAM137.7000107.8000.8300.2100917.7000.0000.0000.6200
28/07/2019SIRINDHORN DAM137.7000106.2000.6200.0000917.7000.0000.0000.6200
29/07/2019SIRINDHORN DAM137.7300106.20006.0000.0000923.0800.0000.0000.6300
30/07/2019SIRINDHORN DAM137.7700106.20007.8200.0000930.2700.0000.0000.6300
31/07/2019SIRINDHORN DAM138.1100106.200063.3800.0000993.0000.0000.0000.6600
01/08/2019SIRINDHORN DAM138.1800106.200013.8100.00001006.2600.0000.0000.5400
02/08/2019SIRINDHORN DAM138.2600106.200015.8500.00001021.5600.0000.0000.5500
03/08/2019SIRINDHORN DAM138.3000106.20008.3200.06001029.2600.0000.0000.5500
04/08/2019SIRINDHORN DAM138.3600106.200023.7400.00001040.9000.0000.0000.5600
05/08/2019SIRINDHORN DAM138.4000106.20008.3600.00001048.7000.0000.0000.5600
06/08/2019SIRINDHORN DAM138.4400106.20008.4100.00001056.5500.0000.0000.5600
07/08/2019SIRINDHORN DAM138.4400106.2000.5600.00001056.5500.0000.0000.5600
08/08/2019SIRINDHORN DAM138.4600106.20004.5000.00001060.4800.0000.0000.5600
09/08/2019SIRINDHORN DAM138.5000106.20008.4700.00001068.3800.0000.0000.5700
10/08/2019SIRINDHORN DAM138.5600107.800012.7500.25001080.3100.0000.0000.5700
11/08/2019SIRINDHORN DAM138.6800106.200024.6900.00001104.4200.0000.0000.5800
12/08/2019SIRINDHORN DAM138.7500107.800015.0700.26001118.6400.0000.0000.5800
13/08/2019SIRINDHORN DAM138.7500106.2000.5800.00001118.6400.0000.0000.5800
14/08/2019SIRINDHORN DAM138.7600106.20002.6300.00001120.6900.0000.0000.5800
15/08/2019SIRINDHORN DAM138.8000106.20008.7800.00001128.8800.0000.0000.5900
16/08/2019SIRINDHORN DAM138.8100106.20002.6400.00001130.9300.0000.0000.5900
17/08/2019SIRINDHORN DAM138.9000107.800019.4500.26001149.5200.0000.0000.5900
18/08/2019SIRINDHORN DAM138.8900107.8000.0000.25001147.4500.00001.2300.5900
19/08/2019SIRINDHORN DAM138.8900107.8000.5900.00001147.4500.0000.0000.5900
20/08/2019SIRINDHORN DAM138.9000107.80002.6700.00001149.5200.0000.0000.5900
21/08/2019SIRINDHORN DAM138.9300106.20006.8400.00001155.7700.0000.0000.6000
22/08/2019SIRINDHORN DAM139.0000106.200015.2500.00001170.4100.0000.0000.6000
23/08/2019SIRINDHORN DAM139.0000106.2000.6000.00001170.4100.0000.0000.6000
24/08/2019SIRINDHORN DAM139.1500107.800032.6800.28001202.2000.0000.0000.6100
26/07/2019THA THUNG NA DAM58.820039.600016.730014.040048.4900.0000.0000.0200
27/07/2019THA THUNG NA DAM58.600040.850012.470014.080046.8600.0000.0000.0200
28/07/2019THA THUNG NA DAM58.480041.820013.160014.040045.9700.0000.0000.0200
29/07/2019THA THUNG NA DAM58.630041.060015.160014.030047.0800.0000.0000.0200
30/07/2019THA THUNG NA DAM58.290040.790011.550014.060044.5500.0000.0000.0200
31/07/2019THA THUNG NA DAM57.680041.750011.340015.290040.5900.0000.0000.0200
01/08/2019THA THUNG NA DAM58.610039.760024.350018.000046.9300.0000.0000.0200
02/08/2019THA THUNG NA DAM58.330039.590016.010018.070044.8500.0000.0000.0200
03/08/2019THA THUNG NA DAM58.670039.550020.580018.040047.3800.0000.0000.0200
04/08/2019THA THUNG NA DAM58.640039.160017.860018.070047.1600.0000.0000.0200
05/08/2019THA THUNG NA DAM58.650039.960018.070017.980047.2300.0000.0000.0200
06/08/2019THA THUNG NA DAM58.830039.220019.330017.980048.5700.0000.0000.0200
07/08/2019THA THUNG NA DAM58.440039.300014.190017.070045.6700.0000.0000.0200
08/08/2019THA THUNG NA DAM58.460039.830014.190014.030045.8200.0000.0000.0200
09/08/2019THA THUNG NA DAM58.930039.750017.500013.990049.3100.0000.0000.0200
10/08/2019THA THUNG NA DAM58.190041.63006.600012.080043.8100.0000.0000.0200
11/08/2019THA THUNG NA DAM58.050042.150012.960013.980042.7700.0000.0000.0200
12/08/2019THA THUNG NA DAM58.550039.070018.770015.040046.4900.0000.0000.0200
13/08/2019THA THUNG NA DAM58.350040.730010.540012.010045.0000.0000.0000.0200
14/08/2019THA THUNG NA DAM58.410039.700012.460012.000045.4500.0000.0000.0200
15/08/2019THA THUNG NA DAM58.600040.150013.570012.140046.8600.0000.0000.0200
16/08/2019THA THUNG NA DAM58.330041.120010.040012.030044.8500.0000.0000.0200
17/08/2019THA THUNG NA DAM58.470040.680013.170012.110045.8900.0000.0000.0200
18/08/2019THA THUNG NA DAM58.280040.130010.700012.090044.4800.0000.0000.0200
19/08/2019THA THUNG NA DAM58.660039.160014.800011.960047.3000.0000.0000.0200
20/08/2019THA THUNG NA DAM58.320040.02009.490012.000044.7800.0000.0000.0200
21/08/2019THA THUNG NA DAM58.360040.810012.400012.080045.0700.0000.0000.0200
22/08/2019THA THUNG NA DAM57.000040.00003.670011.990036.7400.0000.0000.0100
23/08/2019THA THUNG NA DAM58.410039.350020.740012.020045.4500.0000.0000.0200
24/08/2019THA THUNG NA DAM59.160039.080017.610012.020051.0200.0000.0000.0200
26/07/2019UBOLRATANA DAM174.8600162.7800.0000.5000560.5600.0000.0100.4800
27/07/2019UBOLRATANA DAM174.8400162.7700.0000.5000557.5800.00001.5000.4800
28/07/2019UBOLRATANA DAM174.8300162.7600.0000.5000556.1000.0000.0000.4800
29/07/2019UBOLRATANA DAM174.8200162.6500.0000.5000554.6200.0000.0000.4800
30/07/2019UBOLRATANA DAM174.8100162.5600.0000.5000553.1400.0000.0000.4800
31/07/2019UBOLRATANA DAM174.8000162.4900.0000.5000551.6600.0000.0100.4700
01/08/2019UBOLRATANA DAM174.8000162.50001.4200.5000551.6600.0000.0000.4200
02/08/2019UBOLRATANA DAM174.7800162.5000.0000.5000548.7200.00001.5200.4200
03/08/2019UBOLRATANA DAM174.7700162.5000.0000.5000547.2500.0000.0500.4200
04/08/2019UBOLRATANA DAM174.7600162.3000.0000.5000545.7900.0000.0400.4200
05/08/2019UBOLRATANA DAM174.7500162.2800.0000.5000544.3300.0000.0400.4200
06/08/2019UBOLRATANA DAM174.7500162.28001.4200.5000544.3300.0000.0000.4200
07/08/2019UBOLRATANA DAM174.7400162.2800.0000.5000542.8700.0000.0400.4200
08/08/2019UBOLRATANA DAM174.7300162.2900.0000.5000541.4100.0000.0400.4200
09/08/2019UBOLRATANA DAM174.7300162.29001.4200.5000541.4100.0000.0000.4200
10/08/2019UBOLRATANA DAM174.7300162.29001.4300.5100541.4100.0000.0000.4200
11/08/2019UBOLRATANA DAM174.7400162.29002.8800.5000542.8700.0000.0000.4200
12/08/2019UBOLRATANA DAM174.7200162.2900.0000.5300539.9500.00001.4600.4200
13/08/2019UBOLRATANA DAM174.7200162.28001.4100.5000539.9500.0000.0000.4200
14/08/2019UBOLRATANA DAM174.7100162.3400.0000.5100538.5000.0000.0300.4200
15/08/2019UBOLRATANA DAM174.7000162.3400.0000.5000537.0500.0000.0300.4100
16/08/2019UBOLRATANA DAM174.6900162.3400.0000.5000535.6000.0000.0300.4100
17/08/2019UBOLRATANA DAM174.6800162.3400.0000.5000534.1600.0000.0300.4100
18/08/2019UBOLRATANA DAM174.6800162.34001.4200.5000534.1600.0000.0000.4100
19/08/2019UBOLRATANA DAM174.6800162.34001.4100.5000534.1600.0000.0000.4100
20/08/2019UBOLRATANA DAM174.6600162.3400.0000.5000531.2800.00001.4700.4100
21/08/2019UBOLRATANA DAM174.6700162.34002.8600.5000532.7200.0000.0000.4100
22/08/2019UBOLRATANA DAM174.6600162.3000.0000.5100531.2800.0000.0200.4100
23/08/2019UBOLRATANA DAM174.6700162.41002.8600.5000532.7200.0000.0000.4100
24/08/2019UBOLRATANA DAM174.6700162.41001.4100.5000532.7200.0000.0000.4100
26/07/2019VAJIRALONGKORN DAM141.530081.12003.780011.01004502.4900.0000.0000.5400
27/07/2019VAJIRALONGKORN DAM141.550083.040016.780011.07004507.6700.0000.0000.5400
28/07/2019VAJIRALONGKORN DAM141.540085.52008.960011.01004505.0800.0000.0000.5400
29/07/2019VAJIRALONGKORN DAM141.540085.300011.540011.00004505.0800.0000.0000.5400
30/07/2019VAJIRALONGKORN DAM141.540085.340011.460010.92004505.0800.0000.0000.5400
31/07/2019VAJIRALONGKORN DAM141.580084.550026.140015.24004515.4400.0000.0000.5400
01/08/2019VAJIRALONGKORN DAM141.670083.850036.000012.05004538.8200.0000.0000.5800
02/08/2019VAJIRALONGKORN DAM141.840083.790057.060012.12004583.1700.0000.0000.5800
03/08/2019VAJIRALONGKORN DAM141.970083.630046.750012.06004617.2800.0000.0000.5900
04/08/2019VAJIRALONGKORN DAM142.130085.540054.720012.04004659.3700.0000.0000.5900
05/08/2019VAJIRALONGKORN DAM142.460085.0600100.150012.00004746.9200.0000.0000.6000
06/08/2019VAJIRALONGKORN DAM143.070080.7000171.79006.54004911.5600.0000.0000.6100
07/08/2019VAJIRALONGKORN DAM143.390082.180094.44006.00004999.3800.0000.0000.6200
08/08/2019VAJIRALONGKORN DAM143.730082.1000101.11006.09005093.7800.0000.0000.6200
09/08/2019VAJIRALONGKORN DAM144.200085.1900138.84005.86005226.1300.0000.0000.6300
10/08/2019VAJIRALONGKORN DAM144.630085.7400131.47007.85005349.1100.0000.0000.6400
11/08/2019VAJIRALONGKORN DAM145.270084.0900193.09006.06005535.4800.0000.0000.6600
12/08/2019VAJIRALONGKORN DAM145.790083.1300163.16008.12005689.8400.0000.0000.6700
13/08/2019VAJIRALONGKORN DAM146.150084.2200117.10008.01005798.2600.0000.0000.6800
14/08/2019VAJIRALONGKORN DAM146.410083.690087.73007.96005877.3400.0000.0000.6800
15/08/2019VAJIRALONGKORN DAM146.570084.840057.70008.02005926.3400.0000.0000.6900
16/08/2019VAJIRALONGKORN DAM146.710085.080051.77008.01005969.4200.0000.0000.6900
17/08/2019VAJIRALONGKORN DAM146.820085.190042.50007.83006003.4000.0000.0000.6900
18/08/2019VAJIRALONGKORN DAM146.920083.130039.65007.97006034.3900.0000.0000.6900
19/08/2019VAJIRALONGKORN DAM147.020084.040039.77007.99006065.4800.0000.0000.6900
20/08/2019VAJIRALONGKORN DAM147.130083.460043.03008.02006099.7900.0000.0000.7000
21/08/2019VAJIRALONGKORN DAM147.270084.600052.35007.81006143.6300.0000.0000.7000
22/08/2019VAJIRALONGKORN DAM147.420083.650055.92008.04006190.8200.0000.0000.7000
23/08/2019VAJIRALONGKORN DAM147.600085.210065.51007.89006247.7300.0000.0000.7100
24/08/2019VAJIRALONGKORN DAM147.820083.730078.68007.98006317.7100.0000.0000.7100